by BronsonC » Jan 06, 2023 9:15 am
Back working on the vector, started with core on the wings and going to move to the pad next. I have some spots i need to patch that i sanded out because they looked a lil dry but i think once i patch them the core will bond nicely to the hull. Only problem im seeing so far is that theres a hook on the second set of lifting strakes from the pad, i think from sitting on a crappy trailer with short bunks and rotten core for so long. Looks to be around 3/16 or so deep starting from the back of the boat to about 3ft forward. Core gets layed over that set of strakes so im hoping i can put enough wait on it to get the boat to sit flat on the jig in those areas [attachment=0]85E0DC5E-073C-4C2B-81EB-1719457A61BD.jpeg[/attachment][attachment=1]BDA9F32C-5A8F-422F-934B-EE6665154048.jpeg[/attachment]
[size=85][b][i][ Post made via iPhone ][/i][/b][/size] [img]https://www.hydrostreamforums.com/ext/sniper/mobiledevice/images/iPhone.png[/img]